Building an ADU in La Jolla: Layout Options, Design Strategy, and What Drives Cost
In La Jolla, an ADU can be many things: a guest suite, a rental unit, a space for family, or a private studio that finally gives your home breathing room. The best ADUs don't feel like "a box in the backyard." They feel like a small, complete home—designed with intention.
This guide covers ADUs from two angles:
- Design: how to make a smaller space feel premium, calm, and functional
- Construction: how to keep scope clear, costs controlled, and approvals moving
1) Start with the role of the ADU (this sets everything)
Ask:
- Who will live here?
- How long will they stay?
- How private does it need to be?
- Do we need a full kitchen or a kitchenette?
- Is laundry required?
A guest-focused ADU might prioritize a beautiful bath and a flexible living area. A long-term rental unit needs durable finishes, storage, and a kitchen that can handle daily life.
2) Layout: small decisions, huge impact
A well-designed ADU usually solves:
- entry sequence (where do shoes, bags, keys go?)
- storage (without making it feel cramped)
- kitchen efficiency
- bathroom access
- bed placement (or flexible sleeping zone)
3) Designer moves that make an ADU feel expensive
Keep the ceiling and lighting clean
A small space can feel cluttered fast. Clean lighting + consistent trims = calm.
Use continuity to create "bigger"
Same flooring throughout, consistent cabinet style, and a tight palette makes the space feel larger.
Build storage into the architecture
Instead of random furniture, plan:
- built-in closets
- linen storage
- bench storage
- kitchen pantry pullouts
4) Indoor-outdoor connection matters in La Jolla
Even small ADUs benefit from:
- a slider or French doors to a patio
- a defined outdoor seating moment
- privacy landscaping or screens
That connection to outside is the "La Jolla advantage"—use it.
5) Cost drivers: what moves the number
ADU costs are driven by:
- site conditions (access, grading, utilities)
- foundation type
- utility runs (water, sewer, electric)
- window/door package
- kitchen level (full vs kitchenette)
- finish level (basic vs premium)
- timeline and lead times
The earlier you define the finish level, the easier it is to keep the budget stable.
6) Timeline: approvals + build
ADUs have two timelines:
- Approvals / plans / permits
- Construction
The best way to speed up the whole thing is not "rush the build." It's getting design, engineering (if needed), and permitting aligned early so construction runs without stop-and-go.
7) Permits and coastal considerations
Depending on exact location and scope, coastal-related constraints may apply. The best move is to plan for approvals early and keep documentation clean.
Helpful local resources (for planning)
- City of San Diego Development Services (permits & inspections)
- California Coastal Commission (general coastal info)
- San Diego County recorded docs / property info
Our design-build approach for La Jolla ADUs
We design for livability first, then build with clear sequencing so you get:
- a complete-feeling ADU
- durable construction
- clean finish quality
- minimal surprises
Call (858) 434-7166 or email team@calidreamconstruction.com.