Sample timeline (what the weeks usually look like)

By Cali Dream Construction | January 09, 2026 | Escondido

Every project is unique, but here’s a realistic sequence for water saving remodeling Escondido when selections are planned early:

Week 1: Site protection + demolition + rough layout verification

Weeks 2–3: Rough trades (plumbing/electrical/HVAC as needed) + inspections

Weeks 3–4: Close-up work (drywall, prep, waterproofing)

Weeks 4–6: Finishes (tile, paint, cabinets/vanities, flooring)

Weeks 6–7: Trim, fixtures, lighting, hardware

Final: Punch list, detailing, walkthrough

If permits/inspections or specialty materials are involved, the schedule can extend. The biggest lever is early selections and lead-time management.