Sample timeline (what the weeks usually look like)
Every project is unique, but here’s a realistic sequence for water saving remodeling Escondido when selections are planned early:
Week 1: Site protection + demolition + rough layout verification
Weeks 2–3: Rough trades (plumbing/electrical/HVAC as needed) + inspections
Weeks 3–4: Close-up work (drywall, prep, waterproofing)
Weeks 4–6: Finishes (tile, paint, cabinets/vanities, flooring)
Weeks 6–7: Trim, fixtures, lighting, hardware
Final: Punch list, detailing, walkthrough
If permits/inspections or specialty materials are involved, the schedule can extend. The biggest lever is early selections and lead-time management.