Step 8: Construction With Quality Control—Not Guesswork
A high-end remodel should be managed like a system, not a collection of tasks.
Quality control means:
- Daily or weekly site checks (depending on phase)
- Clear communication on what’s happening next
- Verification at key milestones (framing, waterproofing, electrical rough-in, cabinetry install)
- Finish protection so new work isn’t damaged by the next trade
The most expensive remodel mistake is covering up a problem because “we’re behind.” The fix is process and inspection, not speed.