Step 8: The Build Process (What a Smooth New Construction Project Looks Like)
A streamlined build follows clear phases:
1) Pre‑construction planning Scope, budget, schedule, and procurement.
2) Site work + foundation Earthwork, utilities, and structural base.
3) Framing + mechanical rough‑ins Structure plus plumbing/electrical/HVAC planning.
4) Weatherproofing + exterior Windows/doors, roofing, exterior finishes—locking the shell.
5) Interior finishes Drywall/plaster, flooring, cabinetry, tile, paint, fixtures.
6) Trim + final detailing The craftsmanship phase: doors, hardware, final adjustments.
7) Closeout + walkthrough Punch list, system orientation, and final handover.
The secret is coordination: every trade is scheduled as part of a system.