Timeline: what a bathroom remodel usually involves
Bathroom remodels follow a sequence similar to kitchens, but with extra waterproofing and tile steps.
Typical phases:
1) design + selections
2) ordering (tile, vanity, fixtures)
3) demo
4) rough plumbing/electrical
5) inspections (as required)
6) waterproofing + shower build
7) tile install + curing time
8) vanity + counters
9) fixtures + glass
10) punch list + final walkthrough
What slows bathroom projects down:
- specialty tile on backorder
- custom shower glass lead times
- changing fixture selections mid-project