Timeline: what a kitchen remodel typically involves
Kitchen remodels have a sequence. Understanding it reduces stress.
Typical phases:
1) Design + selections (layout, cabinets, surfaces, appliances)
2) Ordering + lead times (cabinets and specialty items often drive schedule)
3) Demo + rough work (electrical, plumbing, HVAC, framing changes)
4) Inspections (as required)
5) Drywall + paint
6) Cabinet install
7) Counters + backsplash
8) Flooring
9) Appliance install + finish plumbing
10) Punch list + final details
The biggest schedule killers:
- changing your mind after ordering cabinets
- waiting to choose tile until after demo
- specialty appliances with long delivery windows